BREWERY EQUIPMENT CASES

KOREA JANGSU CRAFT BREWERY

 Korea JANGSU CRAFT BREWERY

Here I take you learn more about our Korea JANGSU CRAFT BREWERY 500L beer brewing project

Part I: Brewery starting consulting, proposal communication and customized brewery system layout and tank drawing via email and call.

During this process, we confirm the specification and configuration of brewery system:

The main configurations mainly include:

200KG/H completely stainless steel Miller

50KG/H Steam boiler

500L Combination Three vessels brewhouse,steam heating source for both tank

500L MLT&Whirlpool Tank, 500L kettle

800L Hot water tank

8x500L fermentation tanks

1x500L bright beer tanks

1500L Glycol water tank with 5HP chiller

50L CIPAlkali tank and sterile water tank

Control panel: Control panel

Solenoid valve for steam on/off automatic,mashing automatic.

Part II: Manufacturing of 500L beer brewing system

Part III: Shipping of 500L beer brewing system

All brewery system are loaded and shipped in one 40 feet high cube container

Part VI: Installation of 500L beer brewing equipment

Part V: Firs batch brewing

Time : 2018-07-26