BREWERY EQUIPMENT CASES

Thailand 200L Brewpub Project

Thailand 200L Brewpub Project

 

Here I take you learn more about our Thailand 200L beer brewing project

Part I: Brewery starting consulting, proposal communication and customized brewery system layout and tank drawing via email and call.

During this process, we confirm the specification and configuration of brewery system:

The main configurations mainly include:

100KG/H completely stainless steel Miller

200L Combination Three vessels brewhouse,Electric heating source 

200L MLT&Whirlpool Tank, 200L kettle

300L Hot water tank

10x200L fermentation tanks

800L Glycol water tank with 5HP chiller

50L CIP Alkali tank and sterile water tank

Control panel: PLC Control panel, Auto mashing

Part II: Manufacturing of 200L beer brewing system

Part III: Visiting and check the ready system of 200L beer brewing system

Part IV: Shipping of 200L beer brewing system

All brewery system are loaded and shipped in one 20 feet high cube container

Part VI: Installation of 200L beer brewing equipment

Part V: First batch brewing

Time : 2018-07-26