KOREA WILD WAVE BREWING CO. 1500L Brewery Project
Here I take you learn more about our KoreaWild Wave Brewery1500L beer brewing project
Part I: Brewery starting consulting, proposal communication and customized brewery system layout and tank drawing via email and call.
During this process, we confirm the specification and configuration of brewery system:
The main configurations mainly include:
1500L Three vessels brewhouse,steam heating source
1500L MLT
1500LWhirlpool Tank
1500L kettle
4000L Hot water tank
4000L Cold water tank
3x1500L fermentation tanks
5x3000L fermentation tanks
3000L Glycol water tank
Control panel:
PLC Brewhouse Controller,
PID fermentation tank controller
Solenoid valve for steam on/off automatic,mashing automatic.
Pneumatic valve for auto operate
80L Hop Gun with Moveable Diaphragm Pump
Part II: Manufacturing of 1500L beer brewing system
Part III: Visiting and check the ready system of 1500L beer brewing system
Part IV: Shipping of 1500L beer brewing system
All brewery system are loaded and shipped in four 40 feet high cube container
Part VI: Installation of 1500L beer brewing equipment
Part V: First batch brewing